Accelerate Interconnection and Future Proof Your Data Center with FlexGen
The rise of artificial intelligence has catalyzed the exponential expansion of data center computing needs and with it, the power demands required to operate these facilities. To meet this need, Battery Energy Storage Systems (BESS) will drive critical infrastructure development and maximize the efficiency of energy resources both in-front of and behind the meter.
Accelerate Data Center Interconnection
FlexGen Data Center Solutions
Demand Reduction
Leveraging the typical Utility-Scale 4-Hour BESS onsite (behind the meter) at data centers unlocks a variety of energy strategies, including demand reduction.

Off-Grid Operations
An advanced evolution of the demand reduction model, BESS integrated with a variety of generation assets to enable complete grid independence.

Generator Replacement
BESS can be used as a direct replacement for conventional backup generators, transforming data center architecture while reducing overall project timeline and capex.

Power Quality with or without UPS
BESS can function as a medium-voltage line-interactive UPS system, addressing the power quality challenges of modern data centers while simplifying the overall system structure.

Contact Us to Learn More
Over 15 years of experience in energy storage
We have a proven track record and deep understanding of US energy markets.
100+
Projects completed
We've completed over 100 energy storage projects in 10 US markets.
10 GWh
Installed or contracted
That's enough storage capacity to provide electricity to 225,000 average US homes.
1.6 Million
Hours of battery run time
Our systems affecting capacity, flexibility, revenue generation and reliable backup power.
99.95%
Uptime in 2021 Texas freeze
FlexGen provided superior trading performance and critical services when they were needed most.